Contact Agent

3rd and Cherry

301 Cherry St, Bellevue, WA 98104

  • Floors
    61

BOSA Development, the developer behind the wildly-successful INSIGNIA in Downtown Seattle, as well as the ultra-luxury ONE88 in Downtown Bellevue, recently released new information about a third project planned for the former “Civic Square” site located at 3rd Avenue and Cherry Street. The 61-story tower will include approximately 520 condos and will feature a 2-level public plaza, shopping, restaurants, and a variety of first-class amenities. The preliminary design drawings feature a sexy curved facade with foliage and other sustainable elements unlike Seattle has ever seen. Construction is expected to start in 2018.

  • Ownership Type
    Condo

Building Features

Neighborhood

Explore Schools and Lifestyles around 301 Cherry St

Discover More

Learn more about 3rd and Cherry, 301 Cherry St

Featured Bellevue, WA buildings

Powered by Highrises

One Main Street

  • 10Floors
  • 57Units
  • 124Feet
  • 2010Year

Washington Square

  • 22Floors
  • 377Units
  • -Foot
  • 2008Year

Bellevue Pacific Tower

  • 23Floors
  • 171Units
  • 264Feet
  • 1995Year

One Lincoln Tower

  • 42Floors
  • 148Units
  • 450Feet
  • 2005Year

Avenue Bellevue

  • 26Floors
  • 332Units
  • 308Feet
  • 2022Year

The Bravern Apartments

  • -Floor
  • -Unit
  • -Foot
  • -Year

Bellevue Towers

  • 43Floors
  • 539Units
  • 450Feet
  • 2008Year

3rd and Cherry

  • 61Floors
  • 520Units
  • -Foot
  • -Year

MIRA Flats

  • 6Floors
  • -Unit
  • -Foot
  • 2018Year

One88 Condos

  • 21Floors
  • 130Units
  • 240Feet
  • 2019Year

The Palazzo

  • 11Floors
  • -Unit
  • 137Feet
  • 2000Year

ELEV8 Condos

  • 41Floors
  • 350Units
  • 450Feet
  • 2017Year